Deep main shaft and slip breaking system engineering of huoluoqi copper mine in Inner Mongolia

datatime:2020-08-24

Project Name: deep main shaft and slip breaking system project of huoluoqi copper mine in Inner Mongolia

Project location: huoluoqi copper mine, wulatehouqi, Bayannaoer City, Inner Mongolia Autonomous Region

Project Profile:

1. Excavation and construction of main shaft: its net diameter is Φ 5.5m, wall thickness of normal section is 400mm, and well depth is 1105.4m.

976 ml, power distribution tunnel, crushing tunnel, crushing chamber, etc. The total excavation volume is 54881m3, the support volume is 12098m3 and the steel volume is 458t.

Project status: completed