Project Name: ventilation cage well project of algemiev mine in Kazakhstan
Project location: shemonaikha Town, Eastern Republic of Kazakhstan
Project Profile:
The net diameter of ventilation cage shaft is Φ 7m, the depth of shaft is 742.6m, the support of anchor net and reinforced concrete, the driving area is 49-52.8m2, and the support thickness of normal section of shaft is 450-500mm. The total amount of excavation is 38342m3 (including wall seat, air duct, horse head door, etc.). The supporting capacity is 8708m3, the steel bar is 97t, the steel mesh is 32t, and the steel arch is 44T.
Project status: under construction