Infrastructure construction of deep orebody in kamoya copper mine, Congo

datatime:2020-08-24

Project Name: infrastructure shaft and roadway project of deep ore body in kamoya copper mine, Congo

Project location: camboway County, shangkatan Province, DRC

Project Profile:

Shaft engineering 1

(1) The net diameter of the auxiliary shaft is Φ 7.5m, the depth is 497m, and it is supported by anchor net and plain concrete. The excavation volume is 8864 m3 (including five one-way horse head doors, etc.). The amount of support is 5886m3.

(2) The net diameter of return air shaft is Φ 7.5m, the depth is 467m, and it is supported by anchor net and plain concrete. The excavation volume is 8442m3 (including five one-way horse head doors, etc.). The amount of support is 4822m3.

2. Filling air return roadway, transportation drift and ramp, pump room power distribution chamber sump and other projects. The excavation volume is 98318m3 and the support volume is 9880m3.

3. Mining and cutting engineering. The total amount of mining and cutting is 72600 m3.

Project status: under construction