企业文化
Current location: Home > corporate culture > corporate culture
datatime:2020-09-27
Since the first quarter of this year, the mechanized engineering branch has rapidly set off the upsurge of labor competition activities of surprise projects with the main content of "ensuring quality, safety and construction period". The company in a reasonable arrangement of production, strengthen process control at the same time, using the form of task contract, the implementation of more pay, rewards and punishments to cash, cadres three shift on-site follow-up. In order to overcome the difficulties caused by the low blasting rate of rock drill truck, we should take the construction method of puncturing every minute, and put into construction production with the high fighting spirit of hard work and seizing the day; at the same time, we should strengthen the safety and quality management, strengthen the process control, and use the advanced and reliable construction method and technology to ensure the high quality, safe, fast and efficient completion of various construction tasks. (11 April 2007)